IB JANOTTA - REFERENCES

REFERENCES
selection 2021-2026

Angola, Caio Porto Infrastructure

Feasibility study and preliminary design:

  • High-voltage network
  • Grid Connection
  • Main Substation
  • 40 MW power generation
  • Renewable generation

 

Lübeck Port Authority

Network and feasibility study (DIgSILENT PowerFactory) for Skandinavienkai Terminal

 

GIG Energy Service GmbH

Distribution network protection concept

 

St. Vincent and the Grenadines, Kingston Port Modernization

Design review and consulting services for the electrical infrastructure

 

Bahamas, North Eleuthera Int. Airport Rehabilitation Works

Tender design and consulting services for the electrical infrastructure

 

Tanzania, Dar es Salaam Maritime Gateway Program

Consulting services for the electrical port infrastructure

 

Colombia, Port of Cartagena

Network study with focus on storage systems

© IB JANOTTA 2026

Information icon

Wir benötigen Ihre Zustimmung zum Laden der Übersetzungen

Wir nutzen einen Drittanbieter-Service, um den Inhalt der Website zu übersetzen, der möglicherweise Daten über Ihre Aktivitäten sammelt. Bitte überprüfen Sie die Details in der Datenschutzerklärung und akzeptieren Sie den Dienst, um die Übersetzungen zu sehen.