REFERENCES

reference selection 2021-2025

 

 

Angola, Caio Porto Infrastructure

Feasibility study (DIgSILENT PowerFactory) and preliminary design:

- Grid connection

- High-voltage network

- Main Substation

- 40 MW power generation

- Renewable generation

 

Hansestadt Lübeck

Network and feasibility study (DIgSILENT PowerFactory) for Skandinavienkai Terminal

 

St. Vincent and the Grenadines, Kingston Port Modernization

Design review and consulting services for the electrical infrastructure

 

Bahamas, North Eleuthera Int. Airport Rehabilitation Works

Tender design and consulting services for the electrical infrastructure

 

Tanzania, Dar es Salaam Maritime Gateway Program

Consulting services for the electrical infrastructure

 

Colombia, Port of Cartagena

Network study with focus on storage systems

 

Druckversion | Sitemap
© IB Janotta 2025